The newly opened New Huanggang Port is a landmark transportation and connectivity project in the Greater Bay Area. As a vital 24/7 cross-border link between Shenzhen and Hong Kong, this super-hub relies on ACwatt modular UPS solutions to ensure the stable operation of its critical communication, security, and facility systems.

Project Requirements: Zero-Downtime for a Cross-Border Super Hub
As a major gateway for cross-border travel and trade, the New Huanggang Port operates around the clock. Transportation hubs of this scale depend on uninterrupted power for communication networks, security monitoring, access control, and essential facility infrastructure. The project required a power protection solution capable of delivering stable online protection, flexible capacity for future expansion, and dependable battery backup for diverse critical loads.
ACwatt Modular UPS Solution

AC180/100A
High-Capacity Modular UPS
- 100 kVA / 100 kW power modules
- Up to 96.5% online efficiency
- Lead-acid & lithium battery compatible

AC120/20E
High-Density Modular UPS
- Flexible 3P/3P and 3P/1P configurations
- Up to 30 kW in a 2U module
- Up to 97% normal mode efficiency
The modular architecture of both models provides the port with exceptional flexibility for maintenance and future capacity planning, ensuring the power infrastructure can grow alongside the hub’s expanding operations.
Project Value: A Stable Power Foundation for Connected-City Operations
The application of the AC180/100A and AC120/20E at the New Huanggang Port demonstrates ACwatt’s capability to support major transportation and public infrastructure projects. By combining robust online power protection with a service-friendly modular design, ACwatt provides a stable power foundation for the seamless connectivity between Shenzhen and Hong Kong.
This project reflects the deep trust placed in ACwatt for applications where power continuity, system flexibility, and long-term reliability are absolutely essential.

2026-10-15
ACwatt


